FIRST STAGE During the first stage the site is cleared and prepared. All excavations are done. Vapor barrier and reinforcement are installed and by the end of the week floor slab with all the necessary equipment and reinforcement is completed.
SECOND STAGE In the second stage all concretek panels are installed, with alignment and levels verified. By this time concrete application can start using the guides provided in the installation kit.
THIRD STAGE In the third stage the concrete application is finished and final plastering is applied. Plumbing and electrical work are started. Roof treatment is also applied at this stage.
FOURTH STAGE In the last stage all finishes are completed. Floor tiles, doors, windows and kitchen cabinets are installed and all the sanitary, electrical equipments and plumbing work is finished. The project is painted and cleaned.